Drill rigs drilling test borings to gather more data. June 2000.
Design specifications for the repair are complete. Stitch beams arrive on site. December 2000.
Stitch beams tie back connection points.
Installing stitch beams along the back side of Silver Ridge Court, above the slide area. December 2000.
Concrete poured into place around the stitch beams. January 2001.
Installing tie-backs through the stitch pilings. January 2001.
Lateral drill rig for installing tie-backs. January 2001.
Tie-backs are complete and ready to cover. January 2001.